Enregistrez gratuitement cette image en 800 pixels pour usage maquette (click droit, Enregistrer l'image sous...)
|
|
Réf : S09021
Thème :
Navettes Spatiales (1045 images)
Titre : After leaving the Orbiter Processing Facility
Description : (La description de cette image n'existe qu'en anglais)
(01/16/2002) -- After leaving the Orbiter Processing Facility, orbiter Columbia rolls toward the Vehicle Assembly Building where it will be mated with the external tank-solid rocket booster stack. Columbia is scheduled to be launched Feb. 28 on mission STS-109, a Hubble Servicing Mission. The goal of the mission is to service the HST, replacing Solar Array 2 with Solar Array 3, replacing the Power Control Unit, removing the Faint Object Camera and installing the ACS, installing the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and installing New Outer Blanket Layer insulation
|
|